Failed your blower-door test?
If a building has missed its airtightness target, AeroBarrier can often bring it into compliance in a single visit, without tearing into walls to hunt for leaks.
Timing matters.
AeroBarrier works best before finishes are installed. If drywall is hung and taped but the building has not been painted, trimmed or floored, a post-drywall installation is usually possible and can reach a specific airtightness target while we measure it live.
Once finishes such as paint, cabinets, flooring and trim are in, the preparation required grows significantly, and we generally do not seal finished or occupied buildings. Call us as early as possible; even a test at framing or drywall stage that looks borderline is worth a conversation.
Help us quote it quickly.
Your test result
The blower-door result (CFM50 or ACH50) and the target you need to reach.
The building
Conditioned square footage, location, and whether the attic is vented or unvented.
Where construction stands
What has been installed: insulation, drywall, paint, cabinets, flooring or trim.
Where tests are required.
In Southern Nevada, energy code requires a blower-door test of new homes. In California, single-family homes need a passing test when the Title 24 performance model takes a credit for reduced air leakage, and multifamily dwelling units must meet a compartmentalization limit. See for builders and multifamily & commercial.
Request a proposal.
Provide the project's square footage, location and construction stage. We will respond with a written proposal presenting Good, Better and Best options.