Predictable airtightness, one visit.
AeroBarrier replaces piecemeal, trade-by-trade air sealing with a single measured process. You choose the target, we seal to it, and you get a certificate for the file.
Title 24
Title 24 does not require a tested airtightness level for single-family homes. Under the performance approach, a verified reduction in envelope air leakage is an optional compliance credit, which can offset other measures in the energy model. When the model takes that credit, the result must be field verified with a blower-door test, and AeroBarrier delivers a measured, documented result.
Energy code
The energy code adopted in Clark County and the Las Vegas area requires a blower-door test to verify building airtightness. AeroBarrier helps you pass it the first time instead of hunting for leaks after a failed test near the end of the project. Already failed one? See how we can help. Requirements vary by jurisdiction and code edition; confirm the current limit with your building department.
Less babysitting, fewer surprises.
One step instead of many
Traditional air sealing depends on every trade sealing its own penetrations, and results are uncertain until the final test. AeroBarrier seals the whole envelope at once.
Fast
Sealing typically takes one to two hours, and trades can keep working during prep. Trades can return 30 minutes after sealing is complete.
Fixes what others miss
Drywall and sheathing overcuts, gaps between framing members and unsealed penetrations up to ½ inch.
Smaller mechanicals
Tighter buildings can use smaller HVAC equipment, reducing first cost.
Two installation windows.
Pre-drywall: after mechanical rough-in, immediately before insulation (or right after spray foam). Requires an unvented attic (or no attic) and a fully sheathed exterior.
Post-drywall: after drywall is hung, taped and mudded, before finishes. Required when the attic is vented; also an option with an unvented attic or no attic.
No other trades can work inside during installation. Review the full install requirements and share the pre- and post-drywall checklists with your superintendent.
Multifamily and commercial
AeroBarrier works on apartments, townhomes, offices, schools, hospitals and other buildings, including unit-by-unit compartmentalization in multifamily projects. These projects are quoted individually. See multifamily & commercial, our multifamily comparison (PDF) and the multi-unit sealing study (PDF).
Request a proposal.
Provide the project's square footage, location and construction stage. We will respond with a written proposal presenting Good, Better and Best options.