What AeroBarrier costs.
Every proposal includes three options. Pricing is based on square footage and the airtightness level selected, and the per-square-foot rate decreases as buildings get larger.
IECC code compliance. Sealed to under 3.0, and up to 2.0, ACH50.
High comfort and efficiency. Sealed to under 2.0, and up to 1.0, ACH50.
Ultimate comfort and efficiency. Sealed to under 1.0, and up to 0.6, ACH50. Requires balanced ventilation (HRV or ERV).
ACH50 = air changes per hour at 50 pascals, the standard blower-door measure; lower is tighter. For pricing on your project, request a quote.
What affects the price.
- Size. Priced per square foot of conditioned space. The rate drops as the building gets larger. A minimum fee applies to smaller buildings.
- Airtightness level. Good, Better or Best. If the selected level is not achieved, the project is billed at the level attained.
- Location. Projects within about two hours of Carlsbad or Hemet use local pricing. Projects farther away are quoted with remote pricing, which includes travel.
- Starting leakage. Pricing assumes the building tests in at 5.0 ACH50 or less. Leakier buildings carry a surcharge, which we identify during the pre-installation site assessment.
- Preparation. Pricing assumes nothing beyond drywall has been installed. Protecting installed finishes is billed separately.
Multifamily and commercial projects are quoted individually.
Attics and crawl spaces in existing homes
Where conditions allow, we can seal the attic or crawl space of an existing home. These projects are priced by the home's square footage and consist of a two-hour sealing session rather than a guaranteed airtightness level. You receive a sealing certificate showing the leakage before and after.
From inquiry to sealed.
Preliminary proposal
Send the square footage, location and construction stage. We reply with a written proposal showing all three options. Proposals are valid for 30 days.
Site assessment
Once the proposal is accepted, we visit the site to confirm the building is ready and sealing is feasible.
Installation
Sealing is scheduled at the right stage of construction and the sealing itself typically takes one to two hours.
Certificate
You receive a sealing certificate with the before and after results. Certificate figures are measured under preparation conditions and are not a final blower-door result.
Request a proposal.
Provide the project's square footage, location and construction stage. We will respond with a written proposal presenting Good, Better and Best options.