- Project
- Remodel and addition for a bed-and-breakfast conversion
- Location
- Encinitas, CA
- Result
- 77% air leakage reduction in 80 minutes
This project converted a two-bedroom, single-story home into a bed-and-breakfast with a 1,220 sq ft addition, four guest rooms (two on a new second story) and a roof deck over the garage. AeroBarrier was installed after drywall, just before painting.
In 80 minutes of sealing, the building went from an already good 3.2 ACH50 to 0.74 ACH50. That helped the owner reach her goals of a highly energy-efficient operation and consistent comfort for guests. Each room has continuous ventilation for healthy indoor air.
Manual sealing versus AeroBarrier
Before sealing, every visible leakage point was sealed by hand: caulk between drywall and electrical boxes and light fixtures, and foam around wider gaps such as bathroom fan boxes. That careful work produced the 3.2 ACH50 starting point.
With the building under low positive pressure and theatrical smoke inside, smoke was still visibly escaping at many points outside. We left the smoke in during the AeroBarrier process, and within a short time no smoke could be seen escaping anywhere. At the drywall stage, AeroBarrier sealed what careful caulking and foaming could not.
The process also revealed leakage in high-quality aluminum windows, including between the glass and frame of fixed units, where built-up sealant showed air had been passing through.
ACH50 final result
Request a proposal.
Provide the project's square footage, location and construction stage. We will respond with a written proposal presenting Good, Better and Best options.